GEPCO Gujranwala Electric Power Company Limited has been setup over the area of jurisdiction and electrification network of former Area Electricity Board, which was created in early eighties. It encompassed the areas of existing districts of Gujranwala, Hafizabad, Sialkot, Narowal, Gujrat and Mandi Bahauddin
To keep the services optimized and for on growing business needs. They decided to manage infrastructure on a specific centralized data center that should be modular , scalable, redundant and meets the TIA standards.
Silicon Technologies implemented the data center in the given time frame and according to the best practices by considering customer satisfactory on priority. The data center design was scalable and flexible enough to cater future requirements. The new data center comprised of 6 Racks Containment solution, In Row cooling Solution CRV2, APM UPS 90KVA, Vertiv DCIM complete solution, VESDA and Fire Suppression System 165KVA Caterpillar Genset and complete power system and also Conference room and NOC room Setup for user and meeting GEPCO DR site at Gujrat also design by Silicon Technologies for data disaster recovery.
Redundancy in each level, 99.99% efficiency, with high availability able to run 24/7 operations. Provide and maintain the TIA942 recommended Temperature and Humidity level inside cold aisle containment. Saving the Total cost of ownership. Saving utility cost up to 50%. Overall decrease the ROI value. Maintain low PUE value for efficient data center.